Skip to content
Joyce Higashi – j-higashi.com

Joyce Higashi – j-higashi.com

How To Repair A Damaged Roof?

Connor McVilly, August 25, 2023August 25, 2023

When installing shingles, make sure the nails are securely embedded in the felt and sheathing. Over time, the heat of the sun will cause the roof and shingles to expand, causing the nails to move out of place and thus increasing the risk of leakage.

Since the roof is sloping, make sure you layer the shingles from bottom to top, overlapping the top set with the bottom. This will ensure that your roof is protected from the all-weather elements window cleaning.

Rent a nail gun. Most can be rented for around $20 a day. The gun usually comes with a measurement guide which can save a lot of time. The standard width between each row of shingles is 5 inches.

Repair Sheathing

After clearing debris and remodeling the roof, lay a base (sheathing). Eight-foot, 1/2-inch-thick plywood is the standard sheathing material. Measure the opening of the portion of the roof to be shingled, cut the plywood to size, and nail the roof rafters. Stagger the sheathing in a brick pattern for added strength. Do not place the entire 8-foot section of plywood on the ceiling. Such a long piece is structurally unstable in the middle. Continue to install in the brick pattern, staggering the plywood seams until the open area is covered.

Lay Felt Paper

Start by stapling the 6-inch starter strip at the bottom section of roof leaving a 1-inch overhang on the eave to ensure drainage into the gutters. Going from bottom up, lay and nail the remaining felt layers with a 2-inch overlap. Be sure to nail the tar strip on each felt layer to ensure maximum hold.

Install Shingles

Begin by stapling a 6-inch starter strip to the bottom of the roof, leaving a 1-inch overhang on the eave to ensure drainage in the gutter. From bottom to top, lay and nail the remaining layers of felt with a 2-inch overlap. Be sure to nail the tar strip to each felt layer to ensure maximum grip.

Lay the first row of shingles starting at a bottom corner of the roof. Place a base row of shingles following the chalk lines on the felt and move upward in a pyramid shape. Use six nails per shingle to ensure maximum hold, and be sure to always nail on the tar strip. Continue working your way across and up the roof, following your initial pyramid base. If repairing a section of damaged roof, be sure you layer the existing shingles on top of the new. This will ensure a uniform and seamless look.

Opinion

Post navigation

Previous post
Next post

Leave a Reply Cancel reply

You must be logged in to post a comment.

Archives

Categories

Recent Posts

  • Black Running Jacket Men’s

  • Hoodie Jean Jackets for Men

  • Top 10 Best Fiesta Trivet Comparison

  • Long Down Men Jackets

  • Black Jackets Men’s North Face

  • Columbia Mens Csc Sherpa Jackets

  • Designer Leather Jacket Men’s

  • Business Jackets for Mens

  • Top 10 Best Quantum 2500 Fishing Reel Comparison

  • Top 10 Best Fishing Reel Attachment Kit Comparison

  • Jean Jackets Men’s Outfits

  • Striped Fleece Blanket

  • Top 10 Best Berkley Fishing Reels Handle Comparison

  • Sleeveless Sweaters Vest With Pockets for Men’s

  • Men Short Sale

  • Top 10 Best Trivet For Pots Comparison

  • Top 10 Best Hurricane Bluefin Fishing Reel Comparison

  • Top 10 Best Stereo Microphone Cable Comparison

  • Leather Jackets With Sherpa Lining Men

  • Top 10 Best Schooley Ice Fishing Reels Comparison

  • Faded Jean Jackets Mens

  • People for Mens Jackets

  • Marmot Zeus Down Jacket Men’s

  • Mens Sweater With Shirt Underneath

  • Child Girls Boots

  • Sports Jacket

  • Men’s Off White Jacket

  • Email Conversion And Migration Software For Microsoft Outlook

  • Top 10 Best Pflueger Arbor Spinning Fishing Reels Comparison

  • Wooden Open Shelving Units

©2025 Joyce Higashi – j-higashi.com | WordPress Theme by SuperbThemes