Skip to content
Joyce Higashi – j-higashi.com

Joyce Higashi – j-higashi.com

How To Repair A Damaged Roof?

Connor McVilly, August 25, 2023August 25, 2023

When installing shingles, make sure the nails are securely embedded in the felt and sheathing. Over time, the heat of the sun will cause the roof and shingles to expand, causing the nails to move out of place and thus increasing the risk of leakage.

Since the roof is sloping, make sure you layer the shingles from bottom to top, overlapping the top set with the bottom. This will ensure that your roof is protected from the all-weather elements window cleaning.

Rent a nail gun. Most can be rented for around $20 a day. The gun usually comes with a measurement guide which can save a lot of time. The standard width between each row of shingles is 5 inches.

Repair Sheathing

After clearing debris and remodeling the roof, lay a base (sheathing). Eight-foot, 1/2-inch-thick plywood is the standard sheathing material. Measure the opening of the portion of the roof to be shingled, cut the plywood to size, and nail the roof rafters. Stagger the sheathing in a brick pattern for added strength. Do not place the entire 8-foot section of plywood on the ceiling. Such a long piece is structurally unstable in the middle. Continue to install in the brick pattern, staggering the plywood seams until the open area is covered.

Lay Felt Paper

Start by stapling the 6-inch starter strip at the bottom section of roof leaving a 1-inch overhang on the eave to ensure drainage into the gutters. Going from bottom up, lay and nail the remaining felt layers with a 2-inch overlap. Be sure to nail the tar strip on each felt layer to ensure maximum hold.

Install Shingles

Begin by stapling a 6-inch starter strip to the bottom of the roof, leaving a 1-inch overhang on the eave to ensure drainage in the gutter. From bottom to top, lay and nail the remaining layers of felt with a 2-inch overlap. Be sure to nail the tar strip to each felt layer to ensure maximum grip.

Lay the first row of shingles starting at a bottom corner of the roof. Place a base row of shingles following the chalk lines on the felt and move upward in a pyramid shape. Use six nails per shingle to ensure maximum hold, and be sure to always nail on the tar strip. Continue working your way across and up the roof, following your initial pyramid base. If repairing a section of damaged roof, be sure you layer the existing shingles on top of the new. This will ensure a uniform and seamless look.

Opinion

Post navigation

Previous post
Next post

Leave a Reply Cancel reply

You must be logged in to post a comment.

Archives

Categories

Recent Posts

  • Top 10 Best Mens Sport Jackets and Blazers Comparison

  • Top 10 Best Shimmano Fishing Reel Comparison

  • Short Jean Jackets Mens

  • 3 Welfares of CBD Oil for Mental Health

  • Jacket Nike Men’s Winter

  • Anorak Jacket Menswaterproof

  • Peach Shorts for Mens

  • Jean Jackets With Black Pants Men’s

  • Top 10 Best Fishing Reel 4000 Saltwater Comparison

  • Top 10 Best Find Cell Carrier From Number Comparison

  • Top 10 Best V M Trivets Comparison

  • Macy’s Cargo Shorts for Mens

  • Top 10 Best Trivets Cast Iron Comparison

  • Top 10 Best Digital Recorder Stereo Microphone Comparison

  • Men Camo Track Jacket

  • Top 10 Best Okuma Coldwater Fishing Reel Comparison

  • Top 10 Best Fishing Reels Measuring Tape Comparison

  • Top 10 Best Soft Dog Crates for Large Dogs 48 Inch Comparison

  • Top 10 Best Kast King Fishing Reel Covers Comparison

  • Best Air Purifiers for Allergies 2018

  • Blanket Rack Ikea

  • Top 10 Best Number To Verizon Wireless Comparison

  • Anorak Men’s Jackets

  • Nice Mens Sport Coats

  • Why Did Men’s Wear Short Short

  • Men Printed Shorts

  • Top 10 Best Light Up Fishing Rods Comparison

  • Brown Leather Jackets Mens Sale

  • Mens Faux-leather Detachable-hood Motorcycle Jackets

  • Top 10 Best Trivets Macy’s Comparison

Joyce Higashi

©2025 Joyce Higashi – j-higashi.com | WordPress Theme by SuperbThemes